Product Feature:
Fast drying, short construction period
High strength,no cracking
No formaldehyde,no benzene
Easy batch scraping,less effort
Construction Method:
1, Mixed withwaterratioof1: 2(weightratio), add water first and then addpowder.
2, Fully stir until the slurry is not easy to flow with a trowel.
3, Smear thickness 3-10mm/times, but the thinnest place can not be less than 3mm,greater than 10mm thickness should be separated construc tion, molding within 24 hours.
Technical Data Sheet
Parameter Name/Indicator Requirements | Top Coat Of Plaster | Base Coat Of Plaster |
Painted Plaster For Insulation | |
Setting Time (h)
| Presetting Time
| ≥1 | ≥1 | ≥1 |
Final Setting Time
| ≤8 | ≤8 | ≤8 | |
– | Operable Time (min)
| ≥30 | ≥30 | ≥30 |
– | Water Retention Rate (%)
| ≥90 | ≥75 | ≥60 |
Strength (MPa) | Breaking Strength
| ≥3.0 | ≥2.0 | — |
Compressive Strength
| ≥6.0 | ≥4.0 | ≥0.6 | |
Shear-bond Strength
| ≥0.4 | ≥0.3 | — | |
– | Bulk Density (kg/m)
| — | — | ≤500 |